Production came from processing 28,600 tons with a head grade of 11.96g/t Au whilst a significant number of ounces came from the high-grade Wilber Lode stage 2 open pit.
Gold is AU
Production came from processing 28,600 tons with a head grade of 11.96g/t Au whilst a significant number of ounces came from the high-grade Wilber Lode stage 2 open pit.